Home in Madison, AL


 
Just getting started.  First course of forms were set on a footer and used to form the slab/floor (9-26-2001).
The beginnings of a bay window/breakfast nook (9-27-2001).
The builder installed the floor system prior to the pour.  This allows for the pour to be conducted off of the floor system.  Note Brick Ledge.
PanelDeck in and ready to pour the panic/safe room.
The top of the panic/safe room and walls were poured at the same time, providing for the strongest possible structure (note the ducts to provide for ventilation).
Front of home ready to install 2nd floor and move on up.
Rear view of home.
 Front of home with gables ready to be poured.
Getting ready to move in. 
Next Project  Local Projects Page

 