| Just
getting started. First course of forms were set on a footer and used
to form the slab/floor (9-26-2001). |
 |
 |
The
beginnings of a bay window/breakfast nook (9-27-2001). |
| The
builder installed the floor system prior to the pour. This allows
for the pour to be conducted off of the floor system. Note Brick
Ledge. |
 |
 |
PanelDeck
in and ready to pour the panic/safe room. |
| The
top of the panic/safe room and walls were poured at the same time, providing
for the strongest possible structure (note the ducts to provide for ventilation). |
 |
 |
Front
of home ready to install 2nd floor and move on up. |
| Rear
view of home. |
 |
 |
Front
of home with gables ready to be poured. |
| Getting
ready to move in. |
 |
| Next
Project Local Projects Page |
 |