Home in Arab, AL


 
This is the basement going up.
Basement walls at finished height, getting ready for pour.
Daylight side of basement, two windows and doors.
Attaching  floor ledger board with screws prior to pour. Note openings to right of ledger board to allow concrete to firmly secure board via anchor bolts. 
Bracing required on only one side, just to keep walls plumb/straight.  The steel inserts are all you need to contain the concrete in the wall.
Going up with the second story.  Bracing is on the inside, anchored to the floor.
The finished product.  Moved in and ready for landscaping.
Next Project  Local Projects Page

 
Please report problems to webmaster@grahampolysteel.com